Erwin W. Hans
Industrial and Manufacturing Engineering · 2008–2012
A researcher in the Science corpus: 2 papers; trusts 1 researcher and is trusted by 0 researchers here, as inferred from the citation graph.
Subfields
- Industrial and Manufacturing Engineering — 8 citations into it
Whom Erwin W. Hans trusts overall
Their strongest outbound trust, strongest first, inferred from their citations.
Who trusts Erwin W. Hans overall
Papers from Erwin W. Hans's perspective
Ordered by how strongly the researchers Erwin W. Hans trusts endorse each paper. Same corpus, a different order for every researcher.
- Vehicle dispatching with time-dependent travel times (European Journal of Operational Research)
- Building cyclic master surgery schedules with leveled resulting bed occupancy (European Journal of Operational Research)
- Operating theatre planning. (Nursing mirror and midwives journal)
- A dynamic vehicle routing problem with time-dependent travel times (Computers & Operations Research)
- Optimization by Simulated Annealing
- THE 2004 URBAN MOBILITY REPORT
- Simulated annealing and Boltzmann machines
- Flows in Networks
- Models, relaxations and exact approaches for the capacitated vehicle routing problem (Discrete Applied Mathematics)
- A dynamic programming approach to sequencing problems
Their papers
- Robust surgery loading (2008) — 358 citations
- Vehicle routing under time-dependent travel times: The impact of congestion avoidance (2012) — 347 citations