Frank Werner
Strategy and Management · 2001–2019
A researcher in the Science corpus: 6 papers; trusts 1 researcher and is trusted by 1 researcher here, as inferred from the citation graph.
Subfields
- Strategy and Management — 8 citations into it
- Information Systems — 6 citations into it
Whom Frank Werner trusts overall
Their strongest outbound trust, strongest first, inferred from their citations.
Who trusts Frank Werner overall
Papers from Frank Werner's perspective
Ordered by how strongly the researchers Frank Werner trusts endorse each paper. Same corpus, a different order for every researcher.
- Big Data Analytics in Operations Management
- 1 Blockchain's roles in meeting key supply chain management objectives (International Journal of Information Management)
- Incorporating seller/buyer reputation-based system in blockchain-enabled emission trading application
- Blockchain in government: Benefits and implications of distributed ledger technology for information sharing (Government Information Quarterly)
- Blockchain (Business & Information Systems Engineering)
- Big Data and Predictive Analytics and Manufacturing Performance: Integrating Institutional Theory, Resource‐Based View and Big Data Culture (British Journal of Management)
- The Mathematical Theory of Optimal Processes
- Dynamic modeling and control of supply chain systems: A review (Computers & Operations Research)
- Scope for industrial applications of production scheduling models and solution methods (Computers and Chemical Engineering)
- Optimal Control Theory: Applications to Management Science and Economics
Their papers
- Blockchain-oriented dynamic modelling of smart contract design and execution in the supply chain (2019) — 454 citations
- Muons in Air Showers at the Pierre Auger Observatory (2016) — 165 citations
- A dynamic model and an algorithm for short-term supply chain scheduling in the smart factory industry 4.0 (2016) — 476 citations
- Depth of maximum of air-shower profiles at the Pierre Auger Observatory. II. Composition implications (2014) — 181 citations
- Minimizing total flow time in a two-machine flowshop problem with minimum makespan (2001) — 76 citations
- Heuristic algorithms for unrelated parallel machine scheduling with a common due date, release dates, and linear earliness and tardiness penalties (2001) — 92 citations