Minimizing total flow time in a two-machine flowshop problem with minimum makespan
By Jatinder N. D. Gupta, Venkata Ranga Neppalli, Frank Werner. 2001
76 citations recorded by the source corpus.
Subfields: Industrial and Manufacturing Engineering
View Paper: https://www.semanticscholar.org/paper/5102eacf6c816202b8ca30850351cb849ef78f97
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Industrial and Manufacturing Engineering
Citations in the corpus
- A bicriteria flowshop scheduling with a learning effect (2008, background): “In multicriteria two-machine flowshop scheduling, the objective of minimizing weighted sum of total completion time and makespan ðn=2=a P C þ bCmaxÞ and the weighted sum of makespan and maximum tardiness n/2/aCmax + bTmax problems were considered by a number of researchers [50–83].”