Multi-Dimensional Procurement Auctions for Power Reserves: Robust Incentive-Compatible Scoring and Settlement Rules
By Hung-Po Chao, Robert B. Wilson. 2002
137 citations recorded by the source corpus.
Subfields: Management Information Systems, Management Science and Operations Research, Marketing
View Paper: https://www.semanticscholar.org/paper/2ea491041e7f86ae116f6f3ef89a9f466ab389b7
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Management Information Systems
In Management Science and Operations Research
- Axel Ockenfels
- Peter Cramton
- Steven Stoft
- Benjamin F. Hobbs
- M. Peek
- Felix Müsgens
- Beibei Wang
- Alvin E. Roth
In Marketing
Citations in the corpus
- Real-Time Markets for Flexiramp: A Stochastic Unit Commitment-Based Analysis (2016, background): “Reference [30] proposed designs for ancillary markets to correctly consider those costs.”
- A review of electricity product differentiation (2014, background): “Each bid is required to specify the amount of load that can be curtailed, along with the per kW upfront payment and the per kW h usage price for each of the curtailable kW [193].”
- Economics and design of balancing power markets in Germany (2014, methodology): “So, we recommend all readers to use our illustration only complementary to Chao and Wilson [3] work and our treatment above.”
- Capacity Market Fundamentals (2013, background): “…in reserve power markets reflect short-or medium-term opportunity costs for withholding capacity from the spot market, plus short-or medium-term (quasi-) fixed costs, minus expected profits from actually being called to deliver reserve energy (e.g., Chao and Wilson 2002, Ockenfels et al. 2011).”
- Economics and Design of Capacity Markets for the Power Sector (2012, background): “…reserve power markets reflect short- or medium-term opportunity costs for withholding capacity from the spot market, plus short- or medium-term (quasi-) fixed costs, minus expected profits from actually being called to deliver reserve energy (e.g., Chao and Wilson 2002; Ockenfels et al. 2011).”
- Managing electricity procurement cost and risk by a local distribution company (2004, background): “Also, the California Independent System Operator (CAISO) conducts daily auctions to procure capacity reserve and real time energy required by safe and reliable grid operation (Chao and Wilson, 2002).”
- Properties of Scoring Auctions (2008, unknown): “This creates incentive problems we ignore (see Athey and Levin, 2001; Chao and Wilson, 2002; Ewerhart and Fieseler, 2003).”