Ji-Bo Wang
Industrial and Manufacturing Engineering · 2008–2011
A researcher in the Science corpus: 7 papers; trusts 3 researchers and is trusted by 1 researcher here, as inferred from the citation graph.
Subfields
- Industrial and Manufacturing Engineering — 25 citations into it; #2,464 of 2,521 by trust here, #1,287 by citations
- Computer Networks and Communications — 14 citations into it
Whom Ji-Bo Wang trusts overall
Their strongest outbound trust, strongest first, inferred from their citations.
Who trusts Ji-Bo Wang overall
Papers from Ji-Bo Wang's perspective
Ordered by how strongly the researchers Ji-Bo Wang trusts endorse each paper. Same corpus, a different order for every researcher.
- Minimizing the total weighted completion time on a single machine under linear deterioration
- Single-machine group-scheduling problems with deteriorating setup times and job-processing times
- Scheduling problems with a learning effect (European Journal of Operational Research)
- A concise survey of scheduling with time-dependent processing times (European Journal of Operational Research)
- Single Machine Scheduling with Learning Effect Considerations (Annals of Operations Research)
- Single-machine group scheduling problems with deteriorating jobs
- The NP-Completeness Column: An Ongoing Guide
- Behind the Learning Curve: Linking Learning Activities to Waste Reduction
- Scheduling with general job-dependent learning curves (European Journal of Operational Research)
- The learning curve equation
Their papers
- Single-machine due-window assignment problem with learning effect and deteriorating jobs (2011) — 81 citations
- Group scheduling with independent setup times, ready times, and deteriorating job processing times (2011) — 50 citations
- Single-machine scheduling with simple linear deterioration to minimize earliness penalties (2010) — 48 citations
- A due-date assignment problem with learning effect and deteriorating jobs (2010) — 71 citations
- Learning effect and deteriorating jobs in the single machine scheduling problems (2009) — 70 citations
- Single-machine scheduling with a time-dependent deterioration (2009) — 51 citations
- Single-machine group scheduling problems with deteriorating jobs (2008) — 73 citations