Single-machine group scheduling problems with deteriorating jobs
By Ji-Bo Wang, Lin Lin, Feng Shan. 2008
73 citations recorded by the source corpus.
Subfields: Industrial and Manufacturing Engineering
View Paper: https://www.semanticscholar.org/paper/a25c8be5bd63197bab40dc904cb6c4afea613aeb
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Industrial and Manufacturing Engineering
Citations in the corpus
- A note on single-machine makespan problem with general deteriorating function (2009, background): “Wang et al. [ 23 ] considered a case that both the group setup times and job processing times are increasing functions of their starting times.”
- Group scheduling with independent setup times, ready times, and deteriorating job processing times (2011, background): “[18] considered singlemachine group scheduling problems with deterioration jobs, i.”
- Single-machine scheduling with simple linear deterioration to minimize earliness penalties (2010, background): “Wang et al. [ 12 ] considered the single-machine scheduling problems with deterioration jobs and group technology 286 Int J Adv Manuf Technol (2010) 46:285–290”