Congestion-driven transmission expansion in competitive power markets
By Govinda Shrestha, P. Fonseka. IEEE Transactions on Power Systems, 2004
243 citations recorded by the source corpus.
Subfields: Electrical and Electronic Engineering
View Paper: https://www.semanticscholar.org/paper/f2e86be511be8e30841cd447e06ffb6f47bbc191
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Electrical and Electronic Engineering
- Antonio J. Conejo
- H. Zareipour
- Luis Baringo
- Mohammad Shahidehpour
- Javier Contreras
- Rafal Weron
- William D. Rosehart
- Majid Oloomi Buygi
Citations in the corpus
- Transmission Expansion Planning in Electricity Markets (2008, background): “With the introduction of pool-based markets and bilateral contracting, new transmission expansion models propose social welfare maximization instead, [14], [15].”
- A Scenario-Based Multi-Objective Model for Multi-Stage Transmission Expansion Planning (2011, background): “The operator (ISO) would minimize the hourly social cost (HSC) as follows [19]:”
- A Multi-Objective Transmission Expansion Planning Framework in Deregulated Power Systems With Wind Generation (2014, methodology): “Deterministic methods were developed in [2] and [11]–[14] for TNEP problem without taking the power system uncertainties into account.”
- A Transmission Planning Framework Considering Future Generation Expansions in Electricity Markets (2010, background): “Considering that reducing congestion cost results in increasing electricity market fairness and also indirectly improving the system reliability [17], [19], it is considered as a planning criterion in the present work.”
- Influence of Price Responsive Demand Shifting Bidding on Congestion and LMP in Pool-Based Day-Ahead Electricity Markets (2011, background): “The benefit function of DistCos due to their consumption can be determined from the shaded area of Fig. 3 [ 23 ]”