A Scenario-Based Multi-Objective Model for Multi-Stage Transmission Expansion Planning
By P. Maghouli, S. H. Hosseini, Majid Oloomi Buygi, Mohammad Shahidehpour. IEEE Transactions on Power Systems, 2011
205 citations recorded by the source corpus.
Subfields: Electrical and Electronic Engineering
View Paper: https://www.semanticscholar.org/paper/7eaaf05c55a30fcd27a70e76162ae31731967efc
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Electrical and Electronic Engineering
- Marcos J. Rider
- Mohsen Rahmani
- Zhaoyu Wang
- Bokan Chen
- Rubén R. Romero
- Jianhui Wang
- Vijay Vittal
- Junhua Zhao
Citations in the corpus
- Multi-Stage Flexible Expansion Co-Planning Under Uncertainties in a Combined Electricity and Gas Market (2015, background): “Maghouli, et al, 2011 [67] A multi-stage, multi-objective transmission expansion planning framework is proposed with internal scenario analysis.”
- A Fast Solution Method for Stochastic Transmission Expansion Planning (2017, background): “, by either adding these criteria as a constraint [30] or as another objective [31], which is an important topic [32] and will be our future work.”
- A Multi-Objective Transmission Expansion Planning Framework in Deregulated Power Systems With Wind Generation (2014, methodology): “While some studies have used stochastic models [15], [16], none incorporated the reliability criteria into the modeling.”
- A Mixed-Integer Linear Programming Approach for Multi-Stage Security-Constrained Transmission Expansion Planning (2012, methodology): “Considering the highly non-linear and non-convex nature of power systems, various heuristic methods such as genetic algorithms, greedy algorithms and simulated annealing [9]–[11] have been introduced.”
- Robust Optimization for Transmission Expansion Planning: Minimax Cost vs. Minimax Regret (2014, background): “In [18], regret is considered as one of the objectives in a multi-objective optimization framework.”
- Strategies to Reduce the Number of Variables and the Combinatorial Search Space of the Multistage Transmission Expansion Planning Problem (2013, background): “The N-1/N-2 contingencies [24], the uncertainty of future scenarios [25], the environmental impacts [26] and market considerations [27] can all change the constraints or objectives of the planning: among them, the N-1 security is one of the most important issues in transmission planning that has bee”