Out-of-sample tests of forecasting accuracy: an analysis and review
By Len Tashman. 2000
879 citations recorded by the source corpus.
Subfields: Economics and Econometrics, Management Science and Operations Research
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Economics and Econometrics
- Rob J Hyndman
- Fotios Petropoulos
- Konstantinos Nikolopoulos
- Nikolaos Kourentzes
- Rafal Weron
- Vassilios Assimakopoulos
- Sven F. Crone
- J. De Gooijer
In Management Science and Operations Research
- Fotios Petropoulos
- Rob J Hyndman
- Konstantinos Nikolopoulos
- Nikolaos Kourentzes
- Christoph Bergmeir
- Vassilios Assimakopoulos
- Spyros Makridakis
- Evangelos Spiliotis
Citations in the corpus
- Forecasting at Scale (2018, methodology): “This procedure is based on classical “rolling origin” forecast evaluation procedures (Tashman 2000), but uses only a small sequence of cutoff dates rather than making one forecast per historical date.”
- Long Term Probabilistic Load Forecasting and Normalization With Hourly Information (2014, methodology): “At the end, we compare the ex post forecasting accuracy of the C1, C2, B, S and L models on a rolling basis using 2007 through 2010 [15].”
- Forecasting: theory and practice (2020, background): “To overcome these problems, the so-called time-series cross-validation (Hyndman and Athanasopoulos, 2018) extends the out-of-sample approach from a fixed origin to a rolling origin evaluation (Tashman, 2000).”
- 25 years of time series forecasting (2006, methodology): “Several software vendors have implemented automated time series forecasting methods (including multivariate methods); see, e.g., Geriner & Ord (1991), Tashman & Leach (1991) and Tashman (2000).”
- Forecasting model selection through out-of-sample rolling horizon weighted errors (2011, background): “Overfitting and structural changes may further aggravate the divergence between in-sample and post-sample performance (Tashman, 2000).”
- Neural network ensemble operators for time series forecasting (2014, background): “The reader is referred to Tashman (2000) for a detailed description of the evaluation scheme and its advantages.”
- Evaluating time series forecasting models: an empirical study on performance estimation methods (2019, methodology): “rent strategies regarding training/testing split point, growing or sliding window settings, and eventual update of the models. In order to produce a robust estimate of predictive performance, Tashman [38] recommends employing these strategies in multiple test periods. One might create dierent sub-sa”
- An evaluation of neural network ensembles and model selection for time series prediction (2010, background): “Furthermore, the error estimation is robust against irregular origins [ 21 ].”
- Advances in forecasting with neural networks? Empirical evidence from the NN3 competition on time series prediction (2011, background): “…(and, where possible, a rolling origin design), the use of multiple robust error metrics, a comparison with established (statistical) benchmark algorithms, and the analysis of the data conditions under which a method performs well (Tashman, 2000), in order to obtain valid and reliable results.”
- 'Horses for Courses' in demand forecasting (2014, methodology): “ Running sliding simulations in the forecast evaluations (Tashman, 2000).”
- Forecasting spot and forward prices in the international freight market (2007, methodology): “Their tests use overlapping forecast intervals, which Tashman (2000) argues may bias forecast evaluation, and we have been careful to design our forecast evaluation procedures to avoid this problem.”
- To combine or not to combine: selecting among forecasts and their combinations (2005, methodology): “We use a simple model selection criterion based on the sliding simulation idea of Makridakis (1990), also described by Tashman (2000).”
- Accurate On-line Support Vector Regression (2003, background): “A typical online time-series prediction scenario can be represented as follows (Tashman, 2000): (1) Given a time series { ( ), 1, 2,3 } x t t = and prediction origin O, construct a set of training samples, , O B A , from the segment of time series”
- Intermittent demand forecasts with neural networks (2013, methodology): “Therefore 98 out-of-sample multi-step ahead forecasts are produced and their respective errors calculated using MAE, in a rolling origin scheme as discussed by Tashman (2000).”
- EXPONENTIAL SMOOTHING: THE STATE OF THE ART, PART II (2006, neutral): “The question of whether out-of-sample criteria should be used for method selection is beyond our scope—see Tashman (2000) for a review.”
- The use of analogies in forecasting the annual sales of new electronics products (2013, background): “All of this is a concern because, as Tashman (2000) has pointed out, extensive out-of-sample testing is needed to allow reliable inferences to be drawn about the accuracy of a given method.”