Disassembly scheduling: Integer programming models
By Dong-Ho Lee, Hwa-Joong Kim, Gyunghyun Choi, Paul C. Xirouchakis. 2004
59 citations recorded by the source corpus.
Subfields: Industrial and Manufacturing Engineering, Management of Technology and Innovation, Strategy and Management
View Paper: https://www.semanticscholar.org/paper/c7d999af7f44605b1795f25ffff78ecc75ebcee2
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Industrial and Manufacturing Engineering
In Management of Technology and Innovation
Citations in the corpus
- Two-phase heuristic for disassembly scheduling with multiple product types and parts commonality (2006, background): “Taleb and Gupta (1997) suggest a heuristic algorithm for the objective of minimizing disassembly costs of products; and Lee et al. (2004) suggest an integer-programming model with a more general cost-based objective function using the fact that the problem can be regarded as a reversed form of the…”
- Capacitated disassembly scheduling with random demand (2010, unknown): “( 2002 , 2004 ), Lee and Xirouchakis ( 2004 ), Lee ( 2005 ), Jeon et al.”