Two-phase heuristic for disassembly scheduling with multiple product types and parts commonality
By Hwa-Joong Kim, Dong-Ho Lee, Paul C. Xirouchakis. 2006
73 citations recorded by the source corpus.
Subfields: Industrial and Manufacturing Engineering, Strategy and Management
View Paper: https://www.semanticscholar.org/paper/2648b3c7c3e5571d498dfa69ea4cd94e9c01b0f8
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Industrial and Manufacturing Engineering
In Strategy and Management
Citations in the corpus
- Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art. (2010, background): “Remanufacturing is an industrial process involving the conversion of worn-out products into like-new conditions (Aksoy and Gupta, 2005; Kim et al., 2006d).”
- Capacitated disassembly scheduling with random demand (2010, background): “Kim et al. (2006c) considered the problem for the objective of minimising the number of disassembled products and propose an optimisation algorithm after showing that its optimal solution value is equal to that of the corresponding uncapacitated problem, i.e. the problem of Gupta and Taleb (1994).”