Cost overruns in road construction--what are their sizes and determinants?
By James Odeck. 2004
397 citations recorded by the source corpus.
Subfields: Building and Construction, Management Science and Operations Research, Strategy and Management
View Paper: https://www.semanticscholar.org/paper/94ad2f653e715e484dff469edb978172a44b1fc2
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Building and Construction
In Management Science and Operations Research
- Bent Flyvbjerg
- Eric Molin
- C. Cantarelli
- Bert van Wee
- Bent Flybjerg
- T. Harland
- Adrijana Biba Starman
- Mario Pansera
In Strategy and Management
Citations in the corpus
- Large Infrastructure Projects: A Review of the Quality of Demand Forecasts and Cost Estimations (2007, neutral): “It is possible that for a certain project a longer implementation period gives more opportunities for adaptations [see also Odeck (2004) below].”
- Cost Overruns in Large-scale Transportation Infrastructure Projects: Explanations and Their Theoretical Embeddedness (2010, background): “A more recent study on cost overruns by Odeck (2004) uses statistical analysis to derive the average cost overruns and to identify the factors that influence cost overruns.”
- Cost overruns in transportation infrastructure projects: Sowing the seeds for a probabilistic theory of causation (2016, neutral): “Reported cost overruns have been found to vary significantly between studies in various countries ranging, for example, from -11 to 106% (Pickrell, 1990), -59% to 183% (Odeck, 2004), and -12% and 70% (Love et al ., 2014).”
- Characteristics of Cost Overruns for Dutch Transport Infrastructure Projects and the Importance of the Decision to Build and Project Phases (2012, background): “In the literature on cost overruns (see table 1) hardly any attention is given to the project phases (with the exception of Odeck (2004)).”