Optimal production-inventory strategies for a HMMS-type reverse logistics system
By Imre Dobos. 2003
158 citations recorded by the source corpus.
Subfields: Industrial and Manufacturing Engineering, Mechanical Engineering, Strategy and Management
View Paper: https://www.semanticscholar.org/paper/78c3a0bdcb6857f6e8fc5dc9246474b04b293c44
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Industrial and Manufacturing Engineering
In Mechanical Engineering
In Strategy and Management
Citations in the corpus
- Production planning of a hybrid manufacturing–remanufacturing system under uncertainty within a closed-loop supply chain (2012, background): “See De Brito et al. (2003) for a review of case studies; Dekker et al. (2004) for a review of quantitative models for closed-loop supply chains; Geyer and Jackson (2004) propose a framework to help identify and assess supply loop constraints and strategies and they apply it to the recycling and reus”
- Applying possibilistic linear programming to aggregate production planning (2005, background): “Subsequent APP decision-related works include Shi and Haase (1996), Baykasoglu (2001), Buxey (2003), Dobos (2003), Gnoni et al. (2003), Stephen et al. (2003), and Jolayemi and Olorunniwo (2004).”