Applying possibilistic linear programming to aggregate production planning
By Reay-Chen Wang, Tien-Fu Liang. 2005
244 citations recorded by the source corpus.
Subfields: Building and Construction, Control and Systems Engineering, Management Science and Operations Research
View Paper: https://www.semanticscholar.org/paper/628c6b3e7fe9aea5f15fa143c415a2a6ba8aa3eb
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Building and Construction
In Control and Systems Engineering
In Management Science and Operations Research
- S. A. Torabi
- R. Poler
- Josefa Mula
- José Pedro García-Sabater
- S. M. Al-e-hashem
- Elkafi Hassini
- Hooman Malekly
- Mir-Bahador Aryanezhad
Citations in the corpus
- Big data analytics in logistics and supply chain management: Certain investigations for research and applications (2016, unknown): “After sales forecasts and resource requirements, the various alternate production plans are generated (Wang and Liang, 2005; Liu et al., 2011; Mirapour et al., 2011; Li et al., 2013).”
- The effectiveness of a fuzzy mathematical programming approach for supply chain production planning with fuzzy demand (2010, background): “Other applications of possibilistic programming in production planning problems can be found in Inuiguchi et al. (1994), Hsu and Wang (2001), Wang and Fang (2001), Lodwick and Bachman (2005), Wang and Liang (2005), Mula et al. (2008) and Vasant et al. (2008).”
- A multi-objective robust optimization model for multi-product multi-site aggregate production planning in a supply chain under uncertainty (2011, background): “As a result SCM therefore, has recently received much attention (Dolgui and OuldLouly, 2002; Wang and Liang, 2005; Gunnarsson and Rönnqvist, 2008; Lodree and Uzochukwu, 2008; Gebennini et al., 2009).”
- Capacity and material requirement planning modelling by comparing deterministic and fuzzy models (2008, background): “Other applications of possibilistic programming in production planning problems can be found in Gen et al. (1992), Inuiguchi et al. (1994), Hsu and Wang (2001), Wang and Fang (2001), Lodwick and Bachman (2005) and Wang and Liang (2005).”
- A possibilistic programming approach for closed-loop supply chain network design under uncertainty (2010, unknown): “, [29,34–37]).”
- An interactive possibilistic programming approach for multiple objective supply chain master planning (2008, methodology): “Liang [20] developed an interactive multi-objective linear programming model for solving the fuzzy multi-objective transportation problems with piecewise linear membership function.”