Best-worst multi-criteria decision-making method
By Jafar Rezaei. 2015
3,831 citations recorded by the source corpus.
Subfields: Artificial Intelligence, Control and Systems Engineering, Management Science and Operations Research
View Paper: https://www.semanticscholar.org/paper/6723625d082292858d867b823185afc793200472
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Artificial Intelligence
- Dragan Pamucar
- Majid Mohammadi
- Seyed Jafar Sadjadi
- Mahdi Karimi
- Himanshu Gupta
- Lori Tavasszy
- W. S. V. Roekel
- Simonov Kusi‐Sarpong
In Control and Systems Engineering
- Seyed Jafar Sadjadi
- Mahdi Karimi
- Dragan Pamucar
- Majid Mohammadi
- Himanshu Gupta
- Lori Tavasszy
- Sinisa Sremac
- Željko Stević
In Management Science and Operations Research
- Dragan Pamucar
- Himanshu Gupta
- Ivan K. Petrovic
- Simonov Kusi‐Sarpong
- Goran Ćirović
- Joseph Sarkis
- Seyed Jafar Sadjadi
- Mahdi Karimi
Citations in the corpus
- A New Model for Determining Weight Coefficients of Criteria in MCDM Models: Full Consistency Method (FUCOM) (2018, methodology): “Through the examples from the References [14,118,130,144–149] tested so far, FUCOM has showed a high consistency of the results, since the DFC values have been approximately equal to zero (DFC ≈ 0).”
- Measuring the relative importance of the logistics performance index indicators using Best Worst Method (2018, methodology): “Two different models have been proposed for BWM, the former of which (Rezaei, 2015) could lead to multiple optimal solutions, while the latter (Rezaei, 2016) aims at finding unique weights.”
- ZBWM: The Z-number extension of Best Worst Method and its application for supplier development (2018, methodology): “Eight criteria for capabilities dimension and four criteria for willingness dimension proposed by Rezaei (2015) are shown in Tables 6 and 7.”
- Selection of biomass thermochemical conversion technology in the Netherlands: A best worst method approach (2017, methodology): “Here we present the five steps of the linear BWM (Rezaei, 2015, 2016): Step 1 Determining a set of criteria.”
- A Modified TOPSIS Method Based onDNumbers and Its Applications in Human Resources Selection (2016, methodology): “And there are many other methods, such as best worst method [9], characteristic objects method [10], fuzzy setsmethod [11–13], rough sets [14], and analytic hierarchy process [15–17].”
- Modification of the Best-Worst and MABAC methods: A novel approach based on interval-valued fuzzy-rough numbers (2018, methodology): “Since the method is very recent, the literature so far only has the traditional (crisp) BWM (Rezaei, 2015; Rezaei et al., 2015; Rezaei, 2016; Gupta, 2017; Shojaei et al., 2017; Ren et al., 2017; Wan Ahmad et al., 2017) and modification of the BWM carried out using fuzzy numbers (Guo and Zhao, 2017;…”
- A supply chain sustainability innovation framework and evaluation methodology (2018, methodology): “General steps involved in this technique include (Rezaei 2015, 2016): Step 1: Finalisation of decision criteria.”