Cost escalation and schedule delays in road construction projects in Zambia
By C. Kaliba, M. Muya, Kanyuka Mumba. 2009
664 citations recorded by the source corpus.
Subfields: Building and Construction, Management Science and Operations Research, Social Psychology
View Paper: https://www.semanticscholar.org/paper/4b00f3ae83b226724ed6bea1dc2ca74097371d35
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Building and Construction
In Management Science and Operations Research
Citations in the corpus
- Significant Factors Causing Cost Overruns in the Construction Industry in Afghanistan (2017, background): “A research in Zambia revealed that reasons for cost overrun are change in scope, schedule delays, inflation, technical challenges, inclement climate are environmental issues [21].”
- Analyzing delay causes in Egyptian construction projects (2013, background): “All rights reserved. http://dx.doi.org/10.1016/j.jare.2012.11.005 Mohamed M. Marzouk *, Tarek I. El-Rasas Structural Engineering Department, Faculty of Engineering, Cairo University, Egypt A R T I C L E I N F O A B S T R A C T Article history: Received 3 July 2012 Received in revised form 8 November”
- Analysis of cost and schedule performance of international development projects (2010, background): “[34] identified the causes of schedule delay in road construction projects of Zambia as follows: financial processes and difficulties on the part of contractors and clients, contract modification, economic problems, materials procurement, changes in drawings, staffing problems, equipment unavailabil”
- Cost Overruns in Large-scale Transportation Infrastructure Projects: Explanations and Their Theoretical Embeddedness (2010, neutral): “Kaliba et al. (2008) carried out a study into cost escalation and schedule delays in road construction projects in Zambia.”