Disassembly Scheduling with Multiple Product Types
By H. Kim, Dong-Ho Lee, Paul C. Xirouchakis, R. Zust. 2003
73 citations recorded by the source corpus.
Subfields: Industrial and Manufacturing Engineering, Management of Technology and Innovation
View Paper: https://www.semanticscholar.org/paper/48114a6c92a8fc885bd308fd05da8f2d9e45b7d1
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Industrial and Manufacturing Engineering
In Management of Technology and Innovation
Citations in the corpus
- Two-phase heuristic for disassembly scheduling with multiple product types and parts commonality (2006, methodology): “In fact, this paper extends the research results of Kim et al. (2003) with respect to two points.”
- Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art. (2010, background): “suggested by Kim et al. (2003). The second phase improves the”