Generation Adequacy via Call Options Obligations: Safe Passage to the Promised Land
By Shmuel S. Oren. 2005
145 citations recorded by the source corpus.
Subfields: Electrical and Electronic Engineering, Finance
View Paper: https://www.semanticscholar.org/paper/3be779b40a47f4b0b34a7cf5405a042db6027189
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Electrical and Electronic Engineering
- P. Joskow
- D. Finon
- Virginie Pignon
- Benjamin F. Hobbs
- Rafal Weron
- Peter Cramton
- Axel Ockenfels
- Lion Hirth
In Finance
Citations in the corpus
- Electricity and long-term capacity adequacy: The quest for regulatory mechanism compatible with electricity market (2008, methodology): “…Stoft (2005; 2006), to be implemented on the New England market, and the centralised markets for reliability options contracs proposed (in particular) by Vasquez, Rivier and Perez-Arriaga (2001; 2003) and more recently by Oren (2005, 2006) and studied for the Spanish, Colombian, and Dutch markets.”
- Economics and Design of Capacity Markets for the Power Sector (2012, unknown): “Related approaches are described in Bidwell (2005), Chao and Wilson (2004), Cramton and Stoft (2006, 2007, 2008), Oren (2005a, 2005b), and Vazquez et al. (2002).”
- Competitive Electricity Markets and Investment in New Generating Capacity (2006, background): “49 contracts for energy between LSEs and generators as well as option contracts that specify a call price for energy ex ante (e.g. Wolak (2004), Oren (2005)).”
- A Dynamic Analysis of a Demand Curve-Based Capacity Market Proposal: The PJM Reliability Pricing Model (2007, background): “The next section of this paper describes the demand curve approach to capacity markets and outlines issues considered by the dynamic model summarized in Sections III and IV and detailed 1Hogan [16] and Oren [22] disagree with this position, arguing that it is feasible to transition to an energy-only”