Modelling and evaluating product end-of-life options
By G. Erdős, T. Kis, Paul C. Xirouchakis. 2001
82 citations recorded by the source corpus.
Subfields: Industrial and Manufacturing Engineering, Management of Technology and Innovation, Safety, Risk, Reliability and Quality
View Paper: https://www.semanticscholar.org/paper/2cad55303663ac5b76cb4ff4c2d5ffd4c0f5069b
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Industrial and Manufacturing Engineering
In Management of Technology and Innovation
In Safety, Risk, Reliability and Quality
Citations in the corpus
- Mathematical model and solution algorithms for selective disassembly sequencing with multiple target components and sequence-dependent setups (2013, background): “See Erdos, Kritsis, and Xirouchakis (2001), Teunter (2006), Behdad et al. (2010) and Ma et al. (2011) for examples.”
- Two-phase heuristic for disassembly scheduling with multiple product types and parts commonality (2006, unknown): “…Journal of Production Research ISSN 0020–7543 print/ISSN 1366–588X online # 2006 Taylor & Francis http://www.tandf.co.uk/journals DOI: 10.1080/00207540500244443 Tang et al. (2000), Erdös et al. (2001), Kang et al. (2001, 2002, 2003), Lee et al. (2001), Santochi et al. (2002) and Lambert (2003).”
- Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art. (2010, methodology): “In Erdos et al. (2001), a heuristic is used to decompose the problem by discov-”
- Capacitated disassembly scheduling with random demand (2010, background): “…literature, e.g. design for disassembly (Boothroyd and Alting 1992, Veerakamolmal and Gupta 1998), disassembly process planning (O’Shea et al. 1998, Erdös et al. 2001, Kang et al. 2001, 2002, 2003, Lee et al. 2001, Santochi et al. 2002, Lambert 2003, Kang and Xirouchakis 2006), disassembly line…”