An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems
By Weijun Xia, Zhi-ming Wu. Computers & industrial engineering, 2005
714 citations recorded by the source corpus.
Subfields: Artificial Intelligence, Industrial and Manufacturing Engineering
View Paper: https://www.semanticscholar.org/paper/22940aec327b6cb80dc27521c260a3871cab9c7f
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Artificial Intelligence
- Abid Ali Khan
- Imran Ali Chaudhry
- Liang Gao
- Xinyu Shao
- Peigen Li
- Smaïl Niar
- Manas Ranjan Singh
- Guohui Zhang
In Industrial and Manufacturing Engineering
- Abid Ali Khan
- Imran Ali Chaudhry
- Liang Gao
- Smaïl Niar
- A. Ammari
- Abdelghani Bekrar
- Abderezak Jemai
- Maroua Nouiri
Citations in the corpus
- Mathematical modeling and heuristic approaches to flexible job shop scheduling problems (2007, background): “Other literatures of this approach were represented by Kacem, Hammadi, and Borne (2002), Xia and Wu (2005) and Low, Yip, and Wu (2006).”
- Particle swarm optimization algorithm embedded with maximum deviation theory for solving multi-objective flexible job shop scheduling problem (2015, background): “Xia and Wu [2], Tay and Ho [3], and Li et al.”
- Review of job shop scheduling research and its new perspectives under Industry 4.0 (2017, methodology): “(2) Combination algorithms and recent studies based on SA Xia and Wu (2005) [57] used SA to avoid being trapped in a local optimum and particle swarm optimization method to enhance high search efficiency and the solutions showed it was a practical method for a multi-objective flexible job shop sched”
- A research survey: review of flexible job shop scheduling techniques (2016, background): “…machines 59 Baykasoğlu et al. (2004) Research TS based on grammars and Giffler and Thompson priority rule Min of makespan and mean tardiness 55 Xia and Wu (2005) Research PSO + SA Minimum of makespan, workload of most loaded machine, total workload of machines 478 Gao et al. (2006) Research GA…”
- An effective hybrid particle swarm optimization algorithm for multi-objective flexible job-shop scheduling problem (2009, methodology): “Recently, Xia and Wu (2005) proposed a hybrid algorithm using particle swarm optimization (PSO) assignment and simulated annealing (SA) scheduling to optimize multi-objective FJSP, respectively.”
- An effective and distributed particle swarm optimization algorithm for flexible job-shop scheduling problem (2015, methodology): “Xia and Wu introduced a hybrid algorithm that combines PSO and simulated annealing to solve FJSP while minimizing the makespan (Xia and Wu 2005).”