Mathematical modeling and heuristic approaches to flexible job shop scheduling problems
By Parviz Fattahi, M. Saidi-Mehrabad, Fariborz Jolai. Journal of Intelligent Manufacturing, 2007
445 citations recorded by the source corpus.
Subfields: Industrial and Manufacturing Engineering
View Paper: https://www.semanticscholar.org/paper/6b32e7631bd3d1b82ed78fe0ddc03c0a8da6446d
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Industrial and Manufacturing Engineering
Citations in the corpus
- A research survey: review of flexible job shop scheduling techniques (2016, background): “…GA + local search (LS) procedure based on shifting bottleneck Minimum of makespan, workload of most loaded machine, total workload of machines 123 Fattahi et al. (2007) Research TS + SA Makespan 133 Ho and Tay (2008) Research GA + guided local search Minimum of makespan, workload of most…”
- An effective hybrid genetic algorithm and tabu search for flexible job shop scheduling problem (2016, methodology): “The data of experiment 2 is adopted from Fattahi et al. (2007) (http://www.ime.usp.br/ (cid:5) cris/fjs/benchmark/fmj/).”