Yu-yan Han
Industrial and Manufacturing Engineering · 2014–2019
A researcher in the Science corpus: 2 papers; trusts 7 researchers and is trusted by 0 researchers here, as inferred from the citation graph.
Subfields
- Industrial and Manufacturing Engineering — 15 citations into it
- Artificial Intelligence — 12 citations into it
Whom Yu-yan Han trusts overall
Their strongest outbound trust, strongest first, inferred from their citations.
- Rubén Ruiz
- D. V. Veldhuizen
- Fantahun M. Defersha
- Kalyanmoy Deb
- Quan-Ke Pan
- Gary B. Lamont
- Ming-Ying Chen
- Concepción Maroto
- Samir Agrawal
- Mehmet Fatih Tasgetiren
Who trusts Yu-yan Han overall
Papers from Yu-yan Han's perspective
Ordered by how strongly the researchers Yu-yan Han trusts endorse each paper. Same corpus, a different order for every researcher.
- A fast and elitist multiobjective genetic algorithm: NSGA-II
- TWO NEW ROBUST GENETIC ALGORITHMS FOR THE FLOWSHOP SCHEDULING PROBLEM
- Approach by localization and multiobjective evolutionary optimization for flexible job-shop scheduling problems (IEEE Trans. Syst. Man Cybern. Part C)
- Genetic algorithm for the flexible job-shop scheduling problem (SMC'03 Conference Proceedings. 2003 IEEE International Conference on Systems, Man and Cybernetics. Conference Theme - System Security and Assurance (Cat. No.03CH37483))
- DE/EDA: A new evolutionary algorithm for global optimization (Information Sciences)
- An effective genetic algorithm for the flexible job-shop scheduling problem (Expert systems with applications)
- A hybrid genetic and variable neighborhood descent algorithm for flexible job shop scheduling problems (Computers & Operations Research)
- A Pareto approach to multi-objective flexible job-shop scheduling problem using particle swarm optimization and local search
- On measuring multiobjective evolutionary algorithm performance (Proceedings of the 2000 Congress on Evolutionary Computation. CEC00 (Cat. No.00TH8512))
- An effective hybrid particle swarm optimization algorithm for multi-objective flexible job-shop scheduling problem (Computers & industrial engineering)