S. F. Fatemi Ghomi
Electrical and Electronic Engineering · 2009–2013
A researcher in the Science corpus: 2 papers; trusts 7 researchers and is trusted by 0 researchers here, as inferred from the citation graph.
Subfields
- Electrical and Electronic Engineering — 15 citations into it
Whom S. F. Fatemi Ghomi trusts overall
Their strongest outbound trust, strongest first, inferred from their citations.
- Carlos Ruiz
- Antonio J. Conejo
- Jae Hyung Roh
- L. Garcés
- Amir Motamedi
- Mohammad Shahidehpour
- Luiz Paulo Lopes Fávero
Papers from S. F. Fatemi Ghomi's perspective
Ordered by how strongly the researchers S. F. Fatemi Ghomi trusts endorse each paper. Same corpus, a different order for every researcher.
- A Bilevel Approach to Transmission Expansion Planning Within a Market Environment (IEEE Transactions on Power Systems)
- Market-Based Coordination of Transmission and Generation Capacity Planning (IEEE Transactions on Power Systems)
- Pool Strategy of a Producer With Endogenous Formation of Locational Marginal Prices (IEEE Transactions on Power Systems)
- A Transmission Planning Framework Considering Future Generation Expansions in Electricity Markets (IEEE Transactions on Power Systems)
- Market-Based Generation and Transmission Planning With Uncertainties (IEEE Transactions on Power Systems)
- Flexible Transmission Expansion Planning With Uncertainties in an Electricity Market (IEEE Transactions on Power Systems)
- Do cooperative enterprises create social trust? (Small Business Economics)
- Economic Criteria for Planning Transmission Investment in Restructured Electricity Markets (IEEE Transactions on Power Systems)
- Equilibria in an Oligopolistic Electricity Pool With Stepwise Offer Curves (IEEE Transactions on Power Systems)
- Strategic Generation Capacity Expansion Planning With Incomplete Information (IEEE Transactions on Power Systems)
Their papers
- Bi-Level Game Approaches for Coordination of Generation and Transmission Expansion Planning Within a Market Environment (2013) — 175 citations
- Scheduling job shop problems with sequence-dependent setup times (2009) — 68 citations