Mathematical modeling for production system with backlogging and failure in repair
By Singa Wang Chiu, Yuan-Shyi Peter Chiu. 2006
67 citations recorded by the source corpus.
View Paper: https://www.semanticscholar.org/paper/fe1b6edfedb7cbd0e4a23b8d8212964c626eea32
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
- Liang-Yuh Ouyang
- Chun-Tao Chang
- Seyed Taghi Akhavan Niaki
- Amir Abbas Najafi
- A. A. Taleeizadeh
- Yung-Fu Huang
- Ata Allah Taleizadeh
- Jinn-Tsair Teng
Citations in the corpus
- Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging (2013, background): “Numerous studies on the problems of EPQ model with rework process have been discussed by Liu and Yang (1996), Hayek and Salameh (2001), Chiu (2003, 2008), Chiu et al. (2004, 2010), Jamal et al. (2004), Chiu and Chiu (2006), Taleizadeh et al. (2010) and their references.”
- ECONOMIC PRODUCTION QUANTITY MODEL WITH SCRAPPED ITEMS AND LIMITED PRODUCTION CAPACITY (2010, methodology): “Chiu, S.W., Gong, D.C. and Wee, H.M. \The e ects of the random defective rate and the imperfect rework process on the economic production quantity model", Japan Journal of Industrial and Applied Mathematics, 21, pp. 375-389 (2004).”