A survey on problems and methods in generalized assembly line balancing
By Christian Becker, Armin Scholl. European Journal of Operational Research, 2006
1,186 citations recorded by the source corpus.
Subfields: Industrial and Manufacturing Engineering
View Paper: https://www.semanticscholar.org/paper/fb31d8feda8b758634495c2e5a951f9b3e7198a5
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Industrial and Manufacturing Engineering
Citations in the corpus
- State-of-the-art exact and heuristic solution procedures for simple assembly line balancing (2006, background): “More general ALBP with additional characteristics like cost objectives, paralleling of stations, equipment selection, and mixed-model production are described and surveyed in Becker and Scholl (2003). Figure 1.”
- Balancing stochastic two-sided assembly lines (2016, background): “However, as noted by Becker and Scholl (2006), the instability of humans’ work rates, the varied skill and motivation of workers, as well as the failure sensitivity of complex processes, requires the consideration of stochastic task times; that is, the task times are not constant but random variable”
- A mathematical model and ant colony algorithm for multi-manned assembly line balancing problem (2011, methodology): “Table 3 The results of the proposed algorithm and dimitriadis [ 2 ] approach for the medium and large size problems”