A genetic algorithm for the resource constrained multi-project scheduling problem
By J. Gonçalves, Jorge José de Magalhães Mendes, Maurício Resende. European Journal of Operational Research, 2008
363 citations recorded by the source corpus.
Subfields: Industrial and Manufacturing Engineering, Management Science and Operations Research
View Paper: https://www.semanticscholar.org/paper/f8e699e53da36be85e623ddbaa04d206b25ee15d
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Industrial and Manufacturing Engineering
In Management Science and Operations Research
Citations in the corpus
- A survey of variants and extensions of the resource-constrained project scheduling problem (2010, background): “[74] aim at minimizing the weighted sum of earliness and tardiness as well as the flow time of each project.”