Multi-job lot streaming to minimize the mean completion time in m-1 hybrid flowshops
By Wei Zhang, C. Yin, Jiyin Liu, R. Linn. 2005
77 citations recorded by the source corpus.
Subfields: Computer Networks and Communications, Industrial and Manufacturing Engineering
View Paper: https://www.semanticscholar.org/paper/f652634774ae163326a3fa08a36e09d2bc635b0d
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Computer Networks and Communications
In Industrial and Manufacturing Engineering
Citations in the corpus
- The hybrid flow shop scheduling problem (2010, background): “Problem Comments [181] FH2, ((QM (k))2 k=1))||Cmax heuristics, lower bounds [214] FHm, ((PM (k))m k=1))||Cmax Neural Networks [219] FHm, ((RM (k))m k=1))|Mj |Cmax GA 2004 [1] FHm, ((PM (k))m k=1))||Cmax bottleneck exploiting heuristic [11] FHm, ((PM (k))m k=1))|avail|several simulation, heuristics, ”