The multimode resource constrained multiproject scheduling problem: Alternative formulations
By Juan Camilo Gómez Zapata, Bri-Mathias S. Hodge, G. Reklaitis. 2008
67 citations recorded by the source corpus.
Subfields: Control and Systems Engineering, Industrial and Manufacturing Engineering, Management Science and Operations Research
View Paper: https://www.semanticscholar.org/paper/f177b0ce60b8a50b1c8bc8a24f9068b14318142f
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Industrial and Manufacturing Engineering
In Management Science and Operations Research
Citations in the corpus
- Project scheduling with finite or infinite number of activity processing modes - A survey (2011, background): “Zapata et al. (2008) propose three alternative formulations of the multi-project version of the MRCPSP, in two of them time is a continuous variable.”
- Comparison of mixed integer linear programming models for the resource-constrained project scheduling problem with consumption and production of resources (2012, methodology): “Specific MILP formulations were proposed for batch plant scheduling, including time-indexed, sequence-based, and event-based formulations (see among others [28, 17, 13, 34]).”