Phasor measurement unit placement techniques for complete and incomplete observability
By R. Nuqui, Arun G. Phadke. IEEE Transactions on Power Delivery, 2005
591 citations recorded by the source corpus.
Subfields: Electrical and Electronic Engineering, Safety, Risk, Reliability and Quality
View Paper: https://www.semanticscholar.org/paper/ecbb96a27c02f967c0f13e31210885f16dd35601
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Electrical and Electronic Engineering
- Rajesh G. Kavasseri
- George N. Korres
- Nikolaos M. Manousakis
- Bei Gou
- Sudarshan K. Srinivasan
- J. Thorp
- Nikolaos P. Theodorakatos
- Xiao Li
In Safety, Risk, Reliability and Quality
- Bei Gou
- Nikolaos M. Manousakis
- George N. Korres
- Rajesh G. Kavasseri
- Sudarshan K. Srinivasan
- Nikolaos P. Theodorakatos
- Anna Scaglione
Citations in the corpus
- Optimal Placement of Phasor Measurement Units with Linear and Non-linear Models (2015, methodology): “A pragmatic approach to the placement problem must recognize the constraints posed by limited communication infrastructure, which is the constraint of not placing PMUs at buses without communication [21].”
- A Framework for Phasor Measurement Placement in Hybrid State Estimation Via Gauss–Newton (2013, background): “Numerical observability, instead, is typically based on the linearized decoupled load flow model [35], and recently the PMU model [10], [13]–[15], [18], [19], [22]–[24], [30], [36], [37], focused on the algebraic invertibility of the PSSE problem.”
- Generalized Integer Linear Programming Formulation for Optimal PMU Placement (2008, methodology): “A novel concept, incomplete observability, has been introduced in [1], where incomplete observability refers to the network condition in which the number and location of the PMUs are insufficient to determine the complete set of bus voltages (the state).”
- A Weighted Least Squares Algorithm for Optimal PMU Placement (2013, methodology): “A graph theoretic approach for placing PMUs based on incomplete observability is presented in [3].”
- Synchronized Phasor Measurement Applications in Power Systems (2010, background): “staged deployment of a monitoring system for full observability [9].”
- Optimal Placement of PMUs by Integer Linear Programming (2008, methodology): “HASOR measurement unit (PMU) becomes more and more attractive to power engineers because it can provide synchronized measurements of real-time phasors of voltage and currents [1].”
- Optimal Multistage Scheduling of PMU Placement: An ILP Approach (2008, background): “Reference [7] proposed an approach for PMU placement which requires complete enumeration of trees.”
- Reliability-Based Incremental PMU Placement (2014, methodology): “2310182 nodes in a system under the normal condition [8], [9] using minimal number of PMUs.”
- Joint Placement of Phasor and Power Flow Measurements for Observability of Power Systems (2011, background): “Therefore, a “phased-in” model, where PMU additions are done in several stages, has also been proposed [ 14 ].”