Constraint - based scheduling : applying constraint programming to scheduling problems
By P. Baptiste, Claude Le Pape, Wim P. M. Nuijten. 2001
568 citations recorded by the source corpus.
Subfields: Computer Networks and Communications, Industrial and Manufacturing Engineering
View Paper: https://www.semanticscholar.org/paper/e097d2528a1b4e42a038e3851a0a8b00ab4d6841
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Computer Networks and Communications
In Industrial and Manufacturing Engineering
Citations in the corpus
- Algorithms for propagating resource constraints in AI planning and scheduling: Existing approaches and new results (2003, background): “• @BULLETA, R 2 , q = [2] [3], AfterEnd is a resource constraint that states that activity A will produce 2 or 3 units of reservoir (this is a decision variable of the problem) R 2 at its end time.”
- Integration of production planning and scheduling: Overview, challenges and opportunities (2009, unknown): “For example, Constraint Programming (CP) scheduling models have been used widely (Baptiste et al., 2001; Hooker, 2006). In this case, however, the integrated model will be a hybrid MIP/CP model, which means that a special solution strategy will be required. A recent review of scheduling formulations”
- Project scheduling with finite or infinite number of activity processing modes - A survey (2011, unknown): “, 1999), and extensively discussed in (Baptiste et al., 2001).”