Analysis of the cost of infrastructure failures in a developing economy: The case of the electricity sector in Nigeria
By A. Adenikinju. 2005
201 citations recorded by the source corpus.
View Paper: https://www.semanticscholar.org/paper/d80b5d2ff19c79b5dd899a5115f9950b44ab1ec3
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
Citations in the corpus
- SMEs Key Failure-Factors: A Comparison between the United Kingdom and Nigeria (2009, background): “However, in Nigeria the situation is not the same as infrastructural inadequacy has been identified as a key constraint to private sector development (Adenikinju 2005).”
- Firms Operating under Electricity Constraints in Developing Countries (2013, unknown): “Adenikinju (2005).”
- When do firms generate? Evidence on in-house electricity supply in Africa (2010, background): “Adenikinju (2005) analyzed the economic cost of power outages in Nigeria. Using the revealed preference approach on business survey data (Bental and Ravid, 1982; Caves et al., 1992; Beenstock et al., 1997), Adenikinju estimated the marginal cost of power outages to be in the range of $0.94 to $3.13 ”
- Paying the Price for Unreliable Power Supplies: In-House Generation of Electricity by Firms in Africa (2009, background): “First, while the overall scale of own generation in Africa is not that substantial overall, it plays a very important in a number of countries in the region, including some of the larger countries (to wit DRC and Nigeria).”