Root mean square error (RMSE) or mean absolute error (MAE)
By Tianfeng Chai, Roland R. Draxler. 2014
929 citations recorded by the source corpus.
Both the root mean square error (RMSE) and the mean absolute error (MAE) are regularly employed in model evaluation studies. Willmott and Matsuura(2005) have suggested that the RMSE is not a good indicator of average model performance and might be a misleading indicator of average error, and thus the MAE would be a better metric for that purpose. While some concerns over using RMSE raised by Willmott and Matsuura(2005) andWillmott et al. (2009) are valid, the proposed avoidance of RMSE in favor of MAE is not the solution. Citing the aforementioned papers, many researchers chose MAE over RMSE to present their model evaluation statistics when presenting or adding the RMSE measures could be more beneficial. In this technical note, we demonstrate that the RMSE is not ambiguous in its meaning, contrary to what was claimed by Willmott et al. (2009). The RMSE is more appropriate to represent model performance than the MAE when the error distribution is expected to be Gaussian. In addition, we show that the RMSE satisfies the triangle inequality requirement for a distance metric, whereasWillmott et al. (2009) indicated that the sums-ofsquares-based statistics do not satisfy this rule. In the end, we discussed some circumstances where using the RMSE will be more beneficial. However, we do not contend that the RMSE is superior over the MAE. Instead, a combination of metrics, including but certainly not limited to RMSEs and MAEs, are often required to assess model performance.
Subfields: Aerospace Engineering, Statistics and Probability
View Paper: https://www.semanticscholar.org/paper/cf003343a33352a9a7552ee6558e07df3c5ff60d
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Statistics and Probability
Citations in the corpus
- A comparative study of different machine learning methods for landslide susceptibility assessment: A case study of Uttarakhand area (India) (2016, background): “In addition,Pp is the proportion of number of pixels that have been classified correctly as landslide or non-landslide pixels, Pexp means the expected agreements, m is the number of observations, ei is the estimated value of the ith observation, ei is the measured value of the ith observation (Benne”