A two-stage multiple-machine assembly scheduling problem for minimizing sum of completion times
By C. Sung, H. A. Kim. 2008
72 citations recorded by the source corpus.
Subfields: Industrial and Manufacturing Engineering
View Paper: https://www.semanticscholar.org/paper/c76f0621d4d4bef968b76a12ac2045e077234db6
Citations in the corpus
- The hybrid flow shop scheduling problem (2010, unknown): “GA [184] FH2, ((2(1) , P2(2)))|assembly(2) |F̄ heuristics [195] FHm, ((PM (k))m k=1))|sizejk|Cmax Particle Swarm Optimization [196] FH2, ((1(1) , P2((2))))|skip((1))|Cmax heuristics 2009 [90] FHm, ((RM (k))m k=1))|Ssd, rj |αCmax + (1 − α)Ū MPF, heuristics, dispatching rules, GA [95] FH2, ((PM (1), 1”