ARC: A compact, high-field, fusion nuclear science facility and demonstration power plant with demountable magnets
By B. Sorbom, J. Ball, T. Palmer, F. Mangiarotti, J. Sierchio, P. Bonoli, C. Kasten, D. Sutherland, H. Barnard, C. B. Haakonsen and 3 more. 2014
546 citations recorded by the source corpus.
The affordable, robust, compact (ARC) reactor is the product of a conceptual design study aimed at reducing the size, cost, and complexity of a combined fusion nuclear science facility (FNSF) and demonstration fusion Pilot power plant. ARC is a ∼200–250 MWe tokamak reactor with a major radius of 3.3 m, a minor radius of 1.1 m, and an on-axis magnetic field of 9.2 T. ARC has rare earth barium copper oxide (REBCO) superconducting toroidal field coils, which have joints to enable disassembly. This allows the vacuum vessel to be replaced quickly, mitigating first wall survivability concerns, and permits a single device to test many vacuum vessel designs and divertor materials. The design point has a plasma fusion gain of Qp ≈ 13.6, yet is fully non-inductive, with a modest bootstrap fraction of only ∼63%. Thus ARC offers a high power gain with relatively large external control of the current profile. This highly attractive combination is enabled by the ∼23 T peak field on coil achievable with newly available REBCO superconductor technology. External current drive is provided by two innovative inboard RF launchers using 25 MW of lower hybrid and 13.6 MW of ion cyclotron fast wave power. The resulting efficient current drive provides a robust, steady state core plasma far from disruptive limits. ARC uses an all-liquid blanket, consisting of low pressure, slowly flowing fluorine lithium beryllium (FLiBe) molten salt. The liquid blanket is low-risk technology and provides effective neutron moderation and shielding, excellent heat removal, and a tritium breeding ratio ≥ 1.1. The large temperature range over which FLiBe is liquid permits an output blanket temperature of 900 K, single phase fluid cooling, and a high efficiency helium Brayton cycle, which allows for net electricity generation when operating ARC as a Pilot power plant.
Subfields: Aerospace Engineering, Biomedical Engineering, Nuclear and High Energy Physics
View Paper: https://www.semanticscholar.org/paper/bc0a5a918f158c04ccfcdaf6021500033beb3f2a
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Nuclear and High Energy Physics
Citations in the corpus
- Overview of the SPARC tokamak (2020, methodology): “2012), ARC (Sorbom et al. 2015; Kuang et al. 2018), and designs by Tokamak Energy (Costley 2016).”
- Superconductors for fusion: a roadmap (2021, methodology): “HTSs can also be operated at elevated temperatures (20 K–30 K), potentially allowing for demountable TF coils [7, 163] that provide easy maintenance access during which the vacuum vessel containing the fusion core is replaced in its entirety, removing typical sector maintenance limitations.”