Estimation of integrated volatility in stochastic volatility models
By Jeannette H. C. Woerner. 2005
52 citations recorded by the source corpus.
Subfields: Economics and Econometrics, Finance
View Paper: https://www.semanticscholar.org/paper/b64a543777414df3f9d1d695dd1f9a105248d840
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Economics and Econometrics
- V. Todorov
- Mark Podolskij
- Ole E. Barndorff-Nielsen
- Jeannette H. C. Woerner
- N. Shephard
- Jean Jacod
- Tim Bollerslev
- José Manuel Corcuera
In Finance
- V. Todorov
- Mark Podolskij
- Ole E. Barndorff-Nielsen
- Jean Jacod
- N. Shephard
- José Manuel Corcuera
- Tim Bollerslev
- Jeannette H. C. Woerner
Citations in the corpus
- Bipower Variation for Gaussian Processes with Stationary Increments (2009, background): “Introduction The theory of bipower, and more generally multipower, variation has been developed out of questions raised in mathematical finance; for motivation, some first results, and applications, see [2], [3], [4], [5], [6], [8], [29], [30], [31], and [32].”
- Power variation of some integral fractional processes (2006, background): “Under some further conditions, (4) is also satisfied for semimartingales with jumps; see Woerner (2005) for the case of H ¼ 1 2 .”
- Asymptotic properties of realized power variations and related functionals of semimartingales (2006, background): “In [8] we have considered the same problems than here when X is a L´evy processes, with almost complete answers.”
- Econometrics of Testing for Jumps in Financial Economics Using Bipower Variation (2005, unknown): “Following Barndorff-Nielsen and Shephard (2004d), Woerner (2003) has studied the robustness of realised power variation δ1−r/2 ∑bt/δc j=1 |yj| r to an infinite numbers of jumps in finite time periods showing that the robustness property of realised power variation goes through in that case.”
- Testing for Common Arrivals of Jumps for Discretely Observed Multidimensional Processes (2009, background): “Tests for deciding whether a given path has jumps or not on the interval [0;T] have been already developed (see [1], [4], [12], [14], [15], [ 17 ], [18]; [3] and [5] discuss some multivariate extensions of the test in [4]).”
- Impact of jumps on returns and realised variances: econometric analysis of time-deformed Lévy processes (2006, background): “innit y. Following Barndor-Nielsen and Shephard (2004b), Woerner (2003) has studied the robustness of realised power variation 1 r=2 Pbt= c j=1 jyj;ij”