Heuristic approach for solving the multi-objective facility layout problem
By C.-W. Chen *, D. Sha. 2005
47 citations recorded by the source corpus.
Subfields: Building and Construction, Industrial and Manufacturing Engineering
View Paper: https://www.semanticscholar.org/paper/a8e1175b991159224a697129feb70460a940b36e
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Building and Construction
- Sonia Hajri-Gabouj
- Amine Drira
- Orhan Türkbey
- S.P. Singh
- Henri Pierreval
- Ramazan Sahin
- Vivek Kumar Singh
In Industrial and Manufacturing Engineering
- Sonia Hajri-Gabouj
- Amine Drira
- Orhan Türkbey
- S.P. Singh
- Henri Pierreval
- Ramazan Sahin
- Vivek Kumar Singh
Citations in the corpus
- Facility layout problems: A survey (2007, methodology): “Most authors combine the different objectives into a single one either by means of Analytic Hierarchy Process (AHP) methodology (Harmonosky & Tothero, 1992; Yang & Kuo, 2003) or using a linear combination of the different objectives (Chen & Sha, 2005).”
- Three-level AHP-based heuristic approach for a multi-objective facility layout problem (2011, methodology): “We apply the procedure of Chen and Sha (2005) for converting the inconsistent matrix into consistent.”
- A simulated annealing algorithm to find approximate Pareto optimal solutions for the multi-objective facility layout problem (2009, methodology): “problem by using fuzzy logic. Chen and Sha [ 20 ] offered a”