No-wait and separate setup three-machine flowshop with total completion time criterion
By Ali Allahverdi, Tariq A. Aldowaisan. 2000
51 citations recorded by the source corpus.
Subfields: Computer Networks and Communications, Industrial and Manufacturing Engineering
View Paper: https://www.semanticscholar.org/paper/a1183f07952f2cd9a56f835aabc31cd59ba50b5e
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Computer Networks and Communications
- Rubén Ruiz
- Ali Allahverdi
- Chi To Ng
- T. C. Edwin Cheng
- Mikhail Y. Kovalyov
- Eva Vallada
- Morteza Mousakhani
In Industrial and Manufacturing Engineering
- Rubén Ruiz
- Chi To Ng
- T. C. Edwin Cheng
- Ali Allahverdi
- Mikhail Y. Kovalyov
- Eva Vallada
- Morteza Mousakhani
- Quan-Ke Pan
Citations in the corpus
- No-wait flowshop with separate setup times to minimize maximum lateness (2007, methodology): “It can be shown that (Allahverdi and Aldowaisan [3], Brown et al.”
- A survey of scheduling problems with setup times or costs (2008, methodology): “Allahverdi and Aldowaisan (2000) considered the F 3=ST si ; no-wait= P C j problem.”