Power distribution planning reference book
By H. Willis. 2000
668 citations recorded by the source corpus.
View Paper: https://www.semanticscholar.org/paper/95265b16423701d90e8aad01012b36d6c8286c92
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
- Javier Contreras
- Kankar Bhattacharya
- R. C. Lotero
- L. Pereira
- L. A. Pereira
- Lucio Barreto
- W. El-Khattam
- M. Salama
Citations in the corpus
- Optimal investment planning for distributed generation in a competitive electricity market (2004, methodology): “The marginal benefit for the DG is obtained from the difference in the objective function before and after removing it. 6) Calculate the benefit-cost-ratio (BCR) [ 13 ] for this DG by dividing the marginal benefit by the total cost of DG. Repeat Steps 5) and 6) for all DG. 7) Modify set by selecting”
- Distribution System Planning With Reliability (2011, methodology): “This work has adopted a planning horizon of 3 years subdivided into periods of 1 year, assuming that, from year onwards, maintenance, operation, and reliability costs remain constant, as in [2].”
- Multistage Model for Distribution Expansion Planning With Distributed Generation—Part I: Problem Formulation (2008, background): “HE problem of expansion planning to a distribution system consists of determining the capacity, siting, and timing of installation of new distribution equipment, taking capacity restrictions on feeders, voltage drop, and demand forecasts into account [ 1 ]–[4].”