Inventory ordering policies of delayed deteriorating items under permissible delay in payments
By Abubakar Ahmad Musa, Babangida Sani. 2012
102 citations recorded by the source corpus.
Subfields: Industrial and Manufacturing Engineering, Management Information Systems, Strategy and Management
View Paper: https://www.semanticscholar.org/paper/9363acff1796a99fe28eadac7db0aa736a329591
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Industrial and Manufacturing Engineering
- Liang-Yuh Ouyang
- Chun-Tao Chang
- Ruud H. Teunter
- Monique Bakker
- Jan Riezebos
- Sheng-Chih Chen
- Ya-Lan Chan
- Qinhua Pan
In Management Information Systems
- Jinn-Tsair Teng
- Liang-Yuh Ouyang
- Ruud H. Teunter
- Chun-Tao Chang
- Monique Bakker
- Jan Riezebos
- Ya-Lan Chan
- Sheng-Chih Chen
In Strategy and Management
- Jinn-Tsair Teng
- Liang-Yuh Ouyang
- Chun-Tao Chang
- Sheng-Chih Chen
- Ya-Lan Chan
- Maw-Sheng Chern
- Qinhua Pan
- Ruud H. Teunter
Citations in the corpus
- Supply chain coordination with trade credit and quantity discount incorporating default risk (2014, unknown): “…by considering more general model settings, such as, perishable products (Aggarwal and Jaggi, 1995; Jamal et al., 1997; Ouyang et al., 2009; Musa and Sani, 2012; Yu, 2013; Chung et al., 2014); price sensitive demand (Arcelus et al., 2001; Abad and Jaggi, 2003; Teng and Chang, 2005); linear…”
- Optimal pricing and ordering policy for non-instantaneous deteriorating items under inflation and customer returns (2014, background): “Musa and Sani [28] proposed a mathematical model for inventory control of non-instantaneous deteriorating items with permissible delay in payments.”
- Stackelberg solution in a vendor-buyer supply chain model with permissible delay in payments. (2013, background): “Musa and Sani (2012) established inventory ordering policies of delayed deteriorating items under permissible delay in payments.”
- Review of inventory systems with deterioration since 2001 (2012, background): “In many cases, the length of the delay period depends on the purchase quantity [27,29,53,54,102,132,163], but there are alternatives [39,72,156,177,196,197,202,204].”
- Optimal production lot with imperfect production process under permissible delay in payments and complete backlogging (2013, background): “Numerous interesting and relevant paper related to trade credits such as Aggarwal and Jaggi (1995), Jamal et al. (1997), Chang (2004), Ouyang et al. (2005), Teng et al. (2005), Goyal et al. (2007), Liao (2008), Teng and Chang (2009), Chang et al. (2010), Musa and Sani (2012), Su (2012) and so on.”