Optimizing the Spinning Reserve Requirements Using a Cost/Benefit Analysis
By Miguel Ortega-Vazquez, Daniel S. Kirschen. IEEE Transactions on Power Systems, 2007
253 citations recorded by the source corpus.
Subfields: Electrical and Electronic Engineering, Safety, Risk, Reliability and Quality
View Paper: https://www.semanticscholar.org/paper/88d45f1fa2d8e69edfda3383660ac13f9c02e0c4
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Electrical and Electronic Engineering
- Yury Dvorkin
- Mushfiqur R. Sarker
- Hoay Beng Gooi
- Mingqiang Wang
- Ricardo J. Bessa
- Miguel Ortega-Vazquez
- Cláudio Monteiro
- Manuel A. Matos
In Safety, Risk, Reliability and Quality
- Mingqiang Wang
- Hoay Beng Gooi
- Yury Dvorkin
- Mushfiqur R. Sarker
- Ricardo J. Bessa
- Miguel Ortega-Vazquez
- Sameh El Khatib
- Jianhui Wang
Citations in the corpus
- Optimal Participation of an Electric Vehicle Aggregator in Day-Ahead Energy and Reserve Markets (2016, methodology): “tion using the sampling process discussed in [32].”
- A Review of Power System Flexibility With High Penetration of Renewables (2019, background): “A compensation scheme is discussed in [64].”
- Analysis and Mitigation of Power Quality Issues in Distributed Generation Systems Using Custom Power Devices (2018, background): “Generally, in a traditional power system, SR allows systems to compensate unpredictability, imbalances, and errors in load and generation estimation [83], [84].”
- Wind power forecasting : state-of-the-art 2009. (2009, methodology): “The method is based on the cost/benefit analysis method proposed in the authors’ previous companion paper (OrtegaVazquez and Kirschen [338]).”
- Setting the Operating Reserve Using Probabilistic Wind Power Forecasts (2011, background): “[23] balance the spinning reserve cost and benefit in an electrical market with unit commitment.”
- Spinning Reserve Estimation in Microgrids (2009, methodology): “In [21-27], the SR requirement is determined by the cost/benefit analysis.”