An Application of Branch and Cut to Open Pit Mine Scheduling
By L. Caccetta, S. Hill. Journal of Global Optimization, 2003
310 citations recorded by the source corpus.
Subfields: Control and Systems Engineering, Industrial and Manufacturing Engineering, Mechanical Engineering
View Paper: https://www.semanticscholar.org/paper/864615288ee43677fe4bccb834eab67c2471a77d
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Control and Systems Engineering
In Industrial and Manufacturing Engineering
In Mechanical Engineering
Citations in the corpus
- Open-pit block sequencing optimization: A mathematical model and solution technique (2016, methodology): “Caccetta and Hill (2003) presented a mixed-integer programming (MIP) model of the long-term MBS problem and developed a branch-and-cut algorithm to solve the problem. Chicoisne et al. (2012) developed an efficient heuristic approach to solve a real-world MBS case. Lamghari and Dimitrakopoulos (2012)”