An exact approach for batch scheduling in flexible flow lines with limited intermediate buffers
By T. Sawik. 2002
70 citations recorded by the source corpus.
Subfields: Industrial and Manufacturing Engineering
View Paper: https://www.semanticscholar.org/paper/830e9202e6340b0d77104ea12fef13b623d218d5
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Industrial and Manufacturing Engineering
Citations in the corpus
- The hybrid flow shop scheduling problem (2010, background): “Problem Comments 1998 [28] FHm, ((PM (k))m k=1))||{Cmax, T̄} dispatching rules [36] FH2, ((PM (k))2 k=1)|skip|Cmax TS [43] FH(m ≤ 3), ((QM (k))m k=1))||Cmax polynomial algorithm when m = 2, B&B and heuristics when m = 3 [68] FH2, ((1(1) , PM (2)))||Ū heuristics [72] FHm, ((PM (k))m k=1))||Cmax heuri”