Contingency Ranking With Respect to Overloads in Very Large Power Systems Taking Into Account Uncertainty, Preventive, and Corrective Actions
By S. Fliscounakis, Patrick Panciatici, Florin Capitanescu, Louis Wehenkel. IEEE Transactions on Power Systems, 2013
271 citations recorded by the source corpus.
Subfields: Electrical and Electronic Engineering
View Paper: https://www.semanticscholar.org/paper/72facc3117b766b9ad195e64b27b6a7adf8a3296
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Electrical and Electronic Engineering
- Daniel D. Molzahn
- I. A. Hiskens
- Steffen Meinecke
- Martin Braun
- Cédric Josz
- Jennifer F. Marley
- Mads R. Almassalkhi
- Nawaf Nazir
Citations in the corpus
- SimBench—A Benchmark Dataset of Electric Power Systems to Compare Innovative Solutions Based on Power Flow Analysis (2020, background): “…in [5,6], also introduce many more grids, their properties and focuses, such as the European representative electricity distribution networks [7], the representative distribution networks of Italy named Atlantide [8–10], the IEEE reliability test system [11,12] or the PEGASE and RTE cases [13,14].”
- Moment/Sum-of-Squares Hierarchy for Complex Polynomial Optimization (2015, background): “s in Section 4.2.3. 4.2. NumericalResults. We consider large test cases representing portions of European power systems: Great Britain (GB) [72], Poland (PL) [77], and systems from the PEGASE project [28,37]. They were preprocessed (see Table 1) to remove low-impedance lines in order to improve the ”
- Solving Multiperiod OPF Problems Using an AC-QP Algorithm Initialized With an SOCP Relaxation (2017, methodology): “The scalability of these methods is further demonstrated using five other large test cases (the Polish 2383wp, 2737sop and 3120sp cases [43], the 2869-bus PEGASE network representing portions of the European power system [45], and a 4259-bus”