A Strategy to Solve the Multistage Transmission Expansion Planning Problem
By G. Vinasco, Marcos J. Rider, Rubén R. Romero. IEEE Transactions on Power Systems, 2011
77 citations recorded by the source corpus.
Subfields: Control and Systems Engineering, Electrical and Electronic Engineering
View Paper: https://www.semanticscholar.org/paper/70fafd1664239bfef8cab39bea59cc70e0eb581c
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Control and Systems Engineering
- Rabih A. Jabr
- Marcos J. Rider
- Rubén R. Romero
- Kevin Tomsovic
- Mohsen Rahmani
- Xiaohu Zhang
- Aleksandar D. Dimitrovski
- Steven H. Low
In Electrical and Electronic Engineering
- Rabih A. Jabr
- Marcos J. Rider
- Mohsen Rahmani
- Rubén R. Romero
- Kevin Tomsovic
- Xiaohu Zhang
- Aleksandar D. Dimitrovski
- Steven H. Low
Citations in the corpus
- Security Constrained Multi-Stage Transmission Expansion Planning Considering a Continuously Variable Series Reactor (2017, methodology): “This result arises since forward planning is myopic and does not see the future benefits from the present reinforcement [4], [7].”
- Strategies to Reduce the Number of Variables and the Combinatorial Search Space of the Multistage Transmission Expansion Planning Problem (2013, methodology): “The authors of [19] have proven that the value of in (5) cannot be greater than .”
- Optimization of AC Transmission System Planning (2013, methodology): “An alternative approximate approach is forward planning [1], where the formulation in Section V-A is solved sequentially for each stage on its own while enforcing the investments in stage to be present in stage [i.”