Flow-Based Transmission Rights and Congestion Management
By Hung-Po Chao, S. Peck, Shmuel S. Oren, Robert B. Wilson. 2000
199 citations recorded by the source corpus.
Subfields: Electrical and Electronic Engineering, Safety, Risk, Reliability and Quality
View Paper: https://www.semanticscholar.org/paper/6eb22d8020d3a75c788d8321db07a9238304d4e1
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Electrical and Electronic Engineering
- Mohammad Shahidehpour
- Tom Brown
- Antonio J. Conejo
- Yves Smeers
- Yong Fu
- Jae Hyung Roh
- Shmuel S. Oren
- Anthony Papavasiliou
In Safety, Risk, Reliability and Quality
- Mohammad Shahidehpour
- Fushuan Wen
- Anastasios G. Bakirtzis
- Felix F. Wu
- Shmuel S. Oren
- Anthony Papavasiliou
- F. Zheng
- Laurens de Vries
Citations in the corpus
- Dispatchable transmission in RTO markets (2005, unknown): “[13], Hogan [14], [15], and Ruff [16]).”
- Inefficiencies in European congestion management proposals (2005, background): “Node quantity nodal price Line flow on line 1 300 25 ( 1-6 ) 200”
- Securing the public interest in electricity generation markets. The myths of the invisible hand and the copper plate (2004, background): “This way the capacity of the network is used more efficiently, while the market still has the benefits of a simple auction procedure (Chao et al., 2000).”
- Large-Scale Integration of Deferrable Demand and Renewable Energy Sources (2014, background): “charges that the aggregator can hedge by buying financial transmission rights (FTRs) [35].”
- Electricity derivatives and risk management (2006, background): “There are two major proposals for using financial instruments as transmission rights in US: (a) the point-to-point financial transmission rights (FTRs) [22–24]; and (b) the flowgate rights (FGRs) [25,26], as outlined in the Standard Market Design (SMD) put forth by the Federal Energy Regulatory Comm”
- A Reinforcement Learning Algorithm for Market Participants in FTR Auctions (2007, background): “A FGR of these links is practically firm, but there is always a risk that the uncovered links might become congested [6].”
- Market-Based Coordination of Transmission and Generation Capacity Planning (2007, background): “A dispatchable flowgate is a transmission capacity for which bids are submitted to the market [4] and [5].”
- Transmission investment and expansion planning in a restructured electricity market (2006, background): “Two types of financial transmission rights have been proposed and implemented: point-to-point financial transmission rights (FTR) [16] and financial flowgate rights (FGR) [17].”
- Cost-Optimal Power System Extension under Flow-Based Market Coupling (2014, methodology): “2The aggregation was done due to very long computational times 3For a general discussion of flow-based transmission rights and congestion management see [16].”