Bond characteristics of CFRP plated concrete members under elevated temperatures
By J. Gamage, R. Al-Mahaidi, M. Wong. 2006
148 citations recorded by the source corpus.
Subfields: Building and Construction, Civil and Structural Engineering
View Paper: https://www.semanticscholar.org/paper/6ea44172e534195fe74b0f768181e089c182ad36
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Building and Construction
- Jian-Guo Dai
- Wanyang Gao
- Jin-Guang Teng
- Yuzhou Zheng
- Wenwei Wang
- John C. Brigham
- F. Pacheco-Torgal
- J. Correia
In Civil and Structural Engineering
- Jian-Guo Dai
- Wanyang Gao
- Jin-Guang Teng
- Yuzhou Zheng
- Wenwei Wang
- John C. Brigham
- Yining Ding
- Z. Abdollahnejad
Citations in the corpus
- Flexural behaviour of reinforced concrete beams strengthened with a composite reinforcement layer: BFRP grid and ECC (2016, background): “However, the bonding behaviour at the FRP-to-concrete interface may deteriorate due to environmental factors, such as moisture, high temperature and fire [8, 9] because of the organic property of the epoxy material.”
- Fire behaviour of reinforced concrete beams strengthened with CFRP laminates: Protection systems with insulation of the anchorage zones (2012, background): “[11,12] on CFRP-strengthened concrete members showed a rapid loss of strength when epoxy adhesive temperature increased beyond 60–70 C.”
- An overview on the potential of geopolymers for concrete infrastructure rehabilitation (2012, background): “According to Gamage et al [45] both experimental results and finite elements calculations show that epoxy adhesives should not be exposed at temperatures above 70 C, in order to maintain the integrity of the strengthened elements.”
- Bond-Slip Model for FRP Laminates Externally Bonded to Concrete at Elevated Temperature (2013, background): “However, existing studies (e.g. Gamage et al. 2006; Gao et al. 2010) have shown that this approach is usually impractical because the fire protection layer needed can be excessively thick (e.g. 70mm for achieving a two-hour fire resistance rating for the epoxy).”