The development of gradual-priority weighting approach for the multi-objective flowshop scheduling problem
By Pei-Chann Chang, J. Hsieh, Shuiyun Lin. 2002
93 citations recorded by the source corpus.
Subfields: Control and Systems Engineering, Industrial and Manufacturing Engineering
View Paper: https://www.semanticscholar.org/paper/6345339437499d9bd24491e218eab2d318097dd6
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Industrial and Manufacturing Engineering
Citations in the corpus
- Flowshop-scheduling problems with makespan criterion: a review (2005, background): “Chang et al. (2002) proposed the gradual-priority weighting (GPW) approach to search the Pareto optimal solutions for the multi-objective flowshopscheduling problem respecting makespan, total flow time, total tardiness, and maximum tardiness.”