The economics of planning electricity transmission to accommodate renewables: Using two-stage optimisation to evaluate flexibility and the cost of disregarding uncertainty
By A. H. Weijde, Benjamin F. Hobbs. 2012
210 citations recorded by the source corpus.
Subfields: Electrical and Electronic Engineering, Finance
View Paper: https://www.semanticscholar.org/paper/60c98d8bddeb3436ddd4e58ff26071f51e0ed01d
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Electrical and Electronic Engineering
- Jonathan L. Ho
- Mohammad Shahidehpour
- Benjamin F. Hobbs
- Francisco D. Muñoz
- Ross Baldick
- Saamrat Kasina
- James D. McCalley
- Heejung Park
In Finance
- Jonathan L. Ho
- Francisco D. Muñoz
- Saamrat Kasina
- Mohammad Shahidehpour
- Ross Baldick
- Benjamin F. Hobbs
Citations in the corpus
- Co-optimization of electricity transmission and generation resources for planning and policy analysis: review of concepts and modeling approaches (2016, methodology): “Stochastic programming is one approach that has been used to for this purpose [69].”
- Transmission Planning Under Uncertainties of Wind and Load: Sequential Approximation Approach (2013, background): “Reference [18] focuses on the two-stage transmission planing model considering uncertainty of an electricity market but not explicitly including uncertainties of wind and load.”
- An Engineering-Economic Approach to Transmission Planning Under Market and Regulatory Uncertainties: WECC Case Study (2014, methodology): “As in [44], we assume perfect competition and nodal pricing; as a result, the generation market equilibrium can be simulated by minimizing the present worth of total investment and operating costs, which is the same objective we assume for transmission planners.”