Planning Regional Water Resources System Using an Interval Fuzzy Bi-Level Programming Method
By Y. Lv, G. Huang, Y. P. Li, Z. Yang, Y. Liu, Guanhui Cheng. 2010
112 citations recorded by the source corpus.
Subfields: Civil and Structural Engineering, Ocean Engineering, Water Science and Technology
View Paper: https://www.semanticscholar.org/paper/5edc6688e98fec2fd6287611c240ddb0c5d47a44
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Civil and Structural Engineering
In Ocean Engineering
In Water Science and Technology
Citations in the corpus
- Joint Monte Carlo and possibilistic simulation for flood damage assessment (2013, background): “2008) and water resources management (Lv et al. 2010; Fu et al. 2012).”
- Maximum entropy-Gumbel-Hougaard copula method for simulation of monthly streamflow in Xiangxi river, China (2015, background): “It is usually a major problem to ensure the availability of hydrologic data, especially for developing countries, who are facing serious water resources problems such as protection of hydro-environment, drought management, operations of water supply utilities and reservoir operation (Li et al. 2008;”
- A stepwise-cluster forecasting approach for monthly streamflows based on climate teleconnections (2015, background): “…streamflow concern many users, such as emergency services, hydropower generators, irrigators, rural and urban water supply authorities and environmental managers (Huang et al. 1996; Lv et al. 2010; Fan et al. 2012; Hu et al. 2012; Ma et al. 2014; Wang et al. 2014; Gao et al. 2010; Gu et al. 2014).”