An approach for estimating the end-of-life product disassembly effort and cost
By Sanchoy K. Das, Pradeep Yedlarajiah, R. Narendra. 2000
219 citations recorded by the source corpus.
Subfields: Industrial and Manufacturing Engineering, Management of Technology and Innovation, Strategy and Management
View Paper: https://www.semanticscholar.org/paper/50e6694646527192dd8d2df3777e90f7b4892499
How researchers see this paper
The researchers whose trusted networks rank it highest, strongest advocate first. Every researcher gets a different order.
In Industrial and Manufacturing Engineering
In Management of Technology and Innovation
In Strategy and Management
Citations in the corpus
- Environmentally conscious manufacturing and product recovery (ECMPRO): A review of the state of the art. (2010, methodology): “Das et al. (2000) estimate disassembly cost and effort by calculating a disassembly effort index comprising of seven factors: time, tools, fixture, access, instruct, hazard, and force requirements.”
- Product architecture assessment: a tool to link product, process, and supply chain design decisions (2005, background): “Note that others have suggested similar measures to assess disassembly efforts for recycling (e.g., Das et al., 2000).”
- A multi-objective fuzzy graph approach for modular formulation considering end-of-life issues (2008, methodology): “Das et al. (2000) presented a multi-factor model to compute the disassembly effort index (DEI) score, which is derived from seven factors including time, tools, fixture, access, instruct, hazard, and force requirements.”